Estudo de caso de troca de isoladores em cadeia em ancoragem utilizando a técnica de linha viva a distância em linha de distribuição de 138 kV.
dc.contributor.advisor | Prof. Dr. Renan Souza Moura | |
dc.contributor.author | João Rafael Brasileiro Assis. | |
dc.contributor.coadvisor | Prof. MSc. Felipe de Sousa Silva | |
dc.date.accessioned | 2023-07-07T12:35:17Z | |
dc.date.available | 2023-07-07T12:35:17Z | |
dc.date.issued | 2023-06-21 | |
dc.description.abstract | Atualmente, com a grande cobrança por produtividade, competitividade e qualidade no mercado de energia, as grandes empresas têm como objetivo satisfazer cada vez mais seus consumidores da melhor forma possível. Nesse sentido, elas buscam eliminar ao máximo as falhas e interrupções no fornecimento de energia.O propósito deste trabalho consiste em analisar a viabilidade do método de execução de linha viva a distância em linhas de distribuição de 138kV. Para isso, foi realizado um estudo de caso real, mais especificamente a troca de isoladores em cadeia em ancoragem.Os resultados obtidos com a aplicação desse método de linha viva foram comparados com a metodologia tradicional, que exige o desligamento do sistema elétrico de potência. Essa comparação permitiu avaliar os benefícios oferecidos pela abordagem de linha viva. Dessa forma, ao longo deste trabalho, foram analisados os aspectos técnicos, operacionais e de segurança relacionados à execução de linha viva a distância em linhas de distribuição de 138kV. Foi explorado um estudo de caso real para embasar os resultados obtidos e fornecer subsídios para a conclusão da viabilidade desse método. | |
dc.description.abstract1 | Nowadays, with the great demand for productivity, competitiveness, and quality in the energy market, large companies aim to satisfy their customers in the best possible way. In this sense, they seek to eliminate power supply failures and interruptions as much as possible. The purpose of this work is to analyze the feasibility of the method “remote live-line execution” in 138 kV distribution lines. For this, a real case study was carried out, more specifically the exchange of insulators string in an anchoring. The results obtained by applying this method were compared with the traditional methodology, which requires the power system to be disconnected. This comparison allowed an evaluation of the benefits offered by the live-line solution. Therefore, in the course of this work, the technical, operational, and safety aspects related to the execution of remote live lines work on 138 kV distribution lines were analyzed. A real case study was explored to support the results obtained and provide subsidies for the conclusion of the viability of this method. | |
dc.identifier.uri | http://hdl.handle.net/20.500.14387/1056 | |
dc.language.iso | Português | |
dc.publisher.campi | Formiga | |
dc.publisher.country | Brasil | |
dc.publisher.institution | Instituto Federal de Minas Gerais | |
dc.rights | Acesso aberto | |
dc.subject.keyword | Linha viva, Linha a viva a distância, Troca de isoladores, Cadeia em ancoragem, Linha de distribuição 138 kV. | |
dc.title | Estudo de caso de troca de isoladores em cadeia em ancoragem utilizando a técnica de linha viva a distância em linha de distribuição de 138 kV. | |
dc.type | Trabalho de Conclusão de Curso |